Port Orange, Florida
This project included 3.2 miles of roadway widening from 2 lanes to 4 lanes. The roadway was being upgraded from a 2-lane rural roadway section to a 4-lane urban divided collective section. The project design included three intersections with turn lanes. ZCA provided the stormwater design, utility design, signing and marking plans, meeting FDOT standards for this widening project. ZCA coordinated with the area franchise utility companies to ensure necessary relocations and upgrades were made.