St. Johns County, Florida
County Road 205 is an existing 3.8 mile section road that was suffering from pavement deterioration and in one section, extensive settlement. This roadway rehabilitation project required Florida Department of Transportation approval and funding through the Small County Road Assistance Program in addition to other typical government agency approvals. These approvals included the Flagler County, St. Johns Water Management District, Department of Environmental Protection, and Army Corps of Engineers. The roadway surface shows signs of severe deterioration in the form of alligator cracking, settlement cracking, shear failure cracking, rutting, and weathering. Services provided for this project included: topographic survey; environmental habitat and wetland identification; geotechnical exploration and design recommendations; and design of roadway safety improvements, widening, resurfacing, partial realignment, and extension of existing drainage pipes/box culverts.