Ormond Beach, Florida
Zev Cohen & Associates, Inc. was the Engineer of Record for the Hand Avenue Collector Road Upgrade for the City of Ormond Beach. This 7,177 foot roadway corridor project upgraded an existing two-lane roadway to a four-lane roadway. This existing roadway was milled and resurfaced. The roadway design aspects of the project improved the roadway with current City and Florida Department of Transportation roadway design standards. The design included over 7,500 feet of 16-inch/12-inch and 8-inch water main along the corridor which includes two directional drills under Florida East Coast Railroad. The corridor upgrade also included new storm water system design and permitting along with a complex lake inter-connect for flood control. This lake inter-connect is also developed for use by canoe/kayak enthusiasts who wish to traverse the various lake systems adjacent to Hand Avenue. The plans also assist in the coordination of an existing FEMA grant that relates to Hand Avenue and the surrounding side streets. ZCA was responsible for public bidding of the project construction documents as well as for complete construction administration services.