386-677-2482
A premier multi-disciplinary consulting firm

Daytona Beach, Florida

The VCSO Evidence Storage Facility project included designing a quarter-mile road that was paved in place of an existing 11’ dirt road.  The access road for the project site was substandard for the proposed state-of-the-art Evidence Facility, which prompted the County to take initiative during the buildings construction; a complete 24’ paved and striped road was installed.  The design of the paved access road included a singular roadway swale along the length of the improvements which now capture runoff and treat/attenuate stormwater.